About Project

Apartment

3 & 4 BHK

Project Status

Completed

Location

No 21, 9, Giri Rd, Satyamurthy Nagar, T. Nagar, Chennai, Tamil Nadu 600017

CC No

EC/Central-II/194/2024 Dated: 03.06.2024

Project Overview

Apartment

3 & 4 BHK

Project Status

Completed

Location

No 21, 9, Giri Rd, Satyamurthy Nagar, T. Nagar, Chennai, Tamil Nadu 600017

CC No

EC/Central-II/194/2024 Dated: 03.06.2024

Features

Rain water Harvesting
Water Treatment Plant
CCTV Surveillance
Fitness Centre
Clubhouse
Party Hall
Water meters for all apartments Digital
Drivers Waiting room with fittings
Security Cabin
Garbage collection room
Toilets for drivers & domestic help
Association Room
DTH Provision
Kids Play area @ Terrace level
Power backups
Access Controlled Doors
Kids Play area (Children Under-8)

Specifications

Flooring

Italian Marble flooring for Living, Dining & Kitchen

Wooden Tiles for Bedroom

Bathrooms- Anti-skid premium tiles

Read More
Wall Finish

Exterior- Weather Proof Emulsion

Interior- Premium/Royal Emulsion

Read More
Bathrooms

Shower Cubicle in all bathrooms.

Kohler /Toto or Equivalent fittings

Hand Shower with mixer in all Bathrooms

Rain shower in the master bathroom.

Read More
Kitchen

Washing Machine / Dishwasher Provision

Read More
Doors

Main door - Teak wood door frame with veneer on both sides and high-quality polish finish

Bedroom Doors- Flush door with veneer on both sides and high-quality polish finish

Read More
Electrical

3-Phase with Individual Meters

Panasonic/Legrand or equivalent modular switches

2-way switches for lights and fans in all bedrooms

Read More

Specifications

Floor Plan

Current Status

Location Map

Enquire